Occupier
Identify when and where the signs appeared.
- Room and date
- Safe sample or photograph
- Products already applied
A pest report can cross a flat, communal route and commercial unit without giving one person control of them all. We define the evidence and responsibility at each boundary.

The occupier can show the newest evidence, but a landlord or managing agent may need to authorise cupboards, basements, roof voids, risers or repairs. For mixed-use premises, a business operator may control a separate waste, stock or kitchen area. Confirming those contacts early prevents the inspection ending at a locked boundary.
Identify when and where the signs appeared.
Arrange keys and authority for common fabric.
Explain business constraints and site routines.
Evidence of a route is separate from legal or contractual responsibility, which the relevant parties may need to determine.
Preparation, observation and access within the occupied rooms.
Identification, treatment, monitoring and a clear record of limitations.
Shared-space access, coordination and authority for building work.
Drainage, joinery, roofing or fire-safe repairs outside treatment scope.
Mice beside kitchen services may be entering within the flat or from a shared void. Cockroach detections can require fixed monitoring around warmth and moisture across connected areas. Bed bugs usually demand a room-led investigation of resting zones and item movement rather than an assumption about the building fabric. Each scope expands only when evidence supports it.
Locate the latest reliable sign and the access available.
Inspect authorised routes that fit the species and pattern.
Separate treatment, preparation, cleaning and building repairs.
Review fresh evidence and record outstanding responsibility.
Room evidence connected carefully to service routes.
View service ↗02Occupied-room scope with contained preparation.
View service ↗03Site records and corrective actions for operators.
View service ↗04Route-led repair notes for the authorised party.
View service ↗The occupier needs re-entry, cleaning and observation guidance. The manager needs confirmed access limitations, shared-fabric findings and a prioritised repair record. A contractor needs the exact location, required performance and reason for the work, not a vague instruction to seal the property.
At review, completed actions are checked against fresh evidence. If a repair remains outstanding, that is recorded separately from the response to treatment so neither issue hides the other.
Bring the evidence and the people who can act on it.
Often the accessible flat can be assessed first. Shared voids, communal rooms and building repairs remain outside that scope until the relevant permission is available.
Log the species evidence, room position and date for each flat. Vertical alignment is useful only when a credible service or fabric route also links the findings.
It should name the precise opening, the evidence that makes it relevant, any building-function constraint and the party able to authorise durable work.
Use a separate operational zone with its own contact, access window and monitoring record. Do not assign it as the source without matching evidence.
Send the postcode, tenancy or management contact, latest sign and any access limits before the visit is arranged.
Local coverage
Explore pest control services in nearby neighbourhoods.